Stabilised Pavements Ltd
Stand B1
In-situ Road Recycling Process
The process takes place on-site to the highest standards using the latest and best equipment available with the fastest turnaround. Specialist machines pulverise the existing road in-situ and then through the addition of a cementitious powder provide a deep structural repair with a 20 year Design Life.